SSG4851
Responsible committee
Electrical engineering
Workarea
Electrical Systems
Published
2015-07-02
Avalible languages
Swedish, English
This document provides directives for coordinated final inspection and commissioning of process plants. Coordination shall take place between process, mechanical, piping, electrical, instrument/control and industrial safety personnel. The purpose of final inspection is to facilitate the commissioning of a production unit and to safeguard its continuous operation by eliminating problems due to mechanical, electrical or instrument engineering shortcomings.
"SSG’s standards are based on the industry’s collective experience and best practices. The standards are developed by SSG’s committees and networks, which include over 500 dedicated specialists from Swedish industry."
Standards
If you need a specific standard or edition, it can be purchased individually through our previous service.